Five-Section Trajectory Design of Thick Glutenite Reservoir in Shengli Oilfield
Abstract
Many blocks of Shengli Oilfield are located in urban areas, and the site selection of well sites is limited. In order to meet the needs of reservoir development and deployment, five-section trajectory is increasingly used. Difficulty in site selection results in directional well development, and reservoir deployment requires vertical well development. In order to resolve the two contradictions, five-section trajectory is used in the well design, and vertical drilling after hitting the target. The problems with this type of trajectory are high torque drag and easier fatigue of the drilling pipe. When the displacement is small, the effect is small. When the displacement is large, it will cause engineering complexity such as difficulty drilling weight transfer and fatigue of drilling pipe. Aiming at the shortcomings of the five-section trajectory, with the help of existing drill string force analysis software, the parameters of the five-section trajectory were analyzed, and reasonable values were recommended to provide an optimization idea for the five-section trajectory.
Keywords
Full Text:
PDFReferences
Li, J. S., Wang, H. D., & Jiang, C. M. (2018). Force analysis of “S” directional well drilling tool assembly. West-China Exploration Engineering, (2), 38-40.
Wang, J. H., Sun, Z. W., Wang, H. F., et al. (2016). Influential factor analysis of 2-D well trajectory frictional torque. Drilling & production technology, 39(4), 12-14.
Chen, G., Li, F. B., Li, S. Y., et al. (2018). Application of torque drag simulation in the field. West-China Exploration Engineering, (3), 42-45.
Cheng, B. F. (2013). “Five-section” directional well fast drilling technology. Neijiang Technology, 2013, (10), 69-70.
Wang, G. (2016). Five-section directional well trajectory control technology in Dawangbei Oilfield. Shandong Industrial Technology, (5), 63.
Du, S. L. (2017). Improvement of pendulum drill assembly in directional well descending section. West-China Exploration Engineering, (9), 129-131, 135.
Gai, D. Z. (2018). Drilling fluid technology for five-section extended reach well in block Pu-79. West-China Exploration Engineering, (6), 79-82.
Liu, H. B., & Feng, H. B. (2003). The drilling technology of Five-intervalled directional well Tian 5-19. Fault-blcok oil & gas field, 10(6), 68-70.
Wang, X., & Wan, J. Y. (2004). “S” directional well drilling technology for TK430CX sidetracking in Tahe Oilfield. Xinjiang Petroleum Science & Technology, 14(3), 1-4.
Wang, J. L., Liu, X. S., Zheng, Y. F., et al. (2018). Analysis of key technologies for increasing drilling speed in the inclined section of five-section wellbore. Petrochemical industry application, 37(2), 16-18.
DOI: http://dx.doi.org/10.3968/11522
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Yuling Dou
This work is licensed under a Creative Commons Attribution 4.0 International License.
Reminder
We are currently accepting submissions via email only.
The registration and online submission functions have been disabled.
Please send your manuscripts to aped@cscanada.net,or aped@cscanada.org for consideration. We look forward to receiving your work.
We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
caooc@hotmail.com; aped@cscanada.net; aped@cscanada.org
Articles published in Advances in Petroleum Exploration and Development are licensed under Creative Commons Attribution 4.0 (CC-BY).
ADVANCES IN PETROLEUM EXPLORATION AND DEVELOPMENT Editorial Office
Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.
Telephone: 1-514-558 6138
Website: Http://www.cscanada.net
Http://www.cscanada.org
E-mail:office@cscanada.net; office@cscanada.org
Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures