Simulated Calculation of Bullheading Method When the Well is Empty

Peibin GONG, Long HE, Shujiang WANG, Xilian FAN, Yang CHEN, Baojiang SUN

Abstract


In the case of drilling mud completely erupted out of wellbore in high pressure gas wells, a series of fluid flowing governing equations are established in the consideration of coupling relationship between gas in well bore and formation. The change in casing pressure and bottom hole pressure with time was numerically simulated during shut in and well killing process. The results show that casing pressure and bottom hole pressure can achieve stable value quickly after shut in. The casing pressure increases rapidly first and then decreases to zero in well killing process. The earlier a well killing is performed, the smaller the peak value of casing pressure will occur under the same kill rate. A high kill rate can generate a small peak value of casing pressure after the well killing starts.


Keywords


Gas well; Empty well; Well Control; Bullheading; Numerical simulation

Full Text:

PDF

References


Blount, E. M., & Soeiinah, E. (1981). Dynamic kill:controlling wild wells a new way.World Oil, (10), 109-126.

Ely, J. W., & Holditch, S. A. (1987). Conventional and unconventional kill techniques for wild wells. SPE 16674.

Gao, Y. H., Sun, B. J., Wang, Z. Y., et al. (2008). Calculation and analysis of wellbore temperature field in deepwater drilling. Journal of China University of Petroleum (Edition of Natural Science), 32(2), 58-62.

Grace, R. D. (2003). Blowout and well control handbook. Gulf Professional Publishing.

Hao, J. F. (1992). Balanced drilling and well control. Beijing: Petroleum Industry Press.

Hao, J. F., & Liu, K. (1988). Unconventional well control techniques. SPE 17845.

Lei, Z. M., & Lin, A. C. (1997). Method on condition that mud is completely ejected. Natural Gas Industry, 17(2), 45-48.

Lei, Z. M., Li, Q. (2000). Well killing technique by direct pumping in method. Natural Gas Industry, 20(3), 54-56.

Li, Y. Z., Yuan, Q. J., Fang, J., et al. (2010). Calculation and application of bullheading. Petroleum Drilling Techniques, 38(4), 63-66.

O’Brien, T. B., & Goins, W. C. (1960). The mechanics of blowouts and how to control them. API, Drilling and production practice.

Otutu, F., Alli, M., Ogunkoya, A., et al. (2005). Modelling and management of annular surface blowouts-an SPDC case study. SPE 98793.

Oudeman, P. (1999). Kill procedures to avoid formation damage in the high rate gas wells of an underground storage project. SPE 54761.

Oudeman, P., & Avest, D. T. (1994). Bull heading to kill live gas wells.SPE 28896.

Sun, B. J., Wang, Z. Y., Gong, P. B., et al. (2011). Application of a seven-component multiphase flow model to deep water well control. Acta Petrolei Sinica, 32(6), 1042-1049.

Vallejo-Arrieta, V. G. (2002). Analytical model to control off-bottom blowouts utilizing the concept of simultaneous dynamic seal and bullheading. Dissertation, Louisiana State University.

Wang, Z. Y., Sun, B. J., & Cheng, H. Q. (2009). Prediction of gas hydrate formation region in the wellbore of deepwater well control. Chinese Journal of Applied Mechanics, 26(2), 224-229.

Yang, J. S. (1992). Fundamentals of gas recovery. Beijing: Petroleum Industry Press.




DOI: http://dx.doi.org/10.3968/10995

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 Peibin GONG

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.


Share us to:   


Reminder

 We are currently accepting submissions via email only.

The registration and online submission functions have been disabled.

Please send your manuscripts to aped@cscanada.net,or  aped@cscanada.org  for consideration. We look forward to receiving your work.

 

We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
caooc@hotmail.com; aped@cscanada.net; aped@cscanada.org

 Articles published in Advances in Petroleum Exploration and Development are licensed under Creative Commons Attribution 4.0 (CC-BY)

ADVANCES IN PETROLEUM EXPLORATION AND DEVELOPMENT Editorial Office

Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.

Telephone: 1-514-558 6138
Website: Http://www.cscanada.net
Http://www.cscanada.org
E-mail:office@cscanada.net;  office@cscanada.org

Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures