The Practice on Accelerating the Horizontal Well of the Xin 123-Ping 80

Yinlu JIA

Abstract


The well Xin 123- Ping 80 is a development horizontal well located in XinZhao Oilfield of the NO.9 oil production plant of the PI5 layer. The original design of the well uses single arc section with a full angular rate of change of 8.47°/30 m. The wellbore orbit optimization technology is used in the field construction, and the design is optimized to the vertical well section by the computer software - the first build and hold wellbore - the second build section - the oil detection and landing - the horizontal section seven-section track profile, the full-angle change rate is optimized to 7°~8°/30m, and the 1.25° single-bend screw LWD measurement system is used in conjunction with the construction. The self-orientation of the inclined angle starts to enter the inversion hole assembly, using directional drilling and composite drilling. In a combined manner, a drilling construction is realized, the mechanical drilling speed of the inclined section and the horizontal section is improved, the drilling cycle is shortened, and the comprehensive drilling cost is saved.
The successful implementation of this well has provided useful reference for such horizontal well construction, and accumulated valuable experience, which has important guiding significance to shorten the drilling period of horizontal well in Daqing oilfield and popularize the application of horizontal well technology.


Keywords


Orbital optimization; Single bit-run drilling; Inverted drill string; Shorten the cycle

Full Text:

PDF

References


Cheng, H. G., Wang, J. D., & Liu, Y. M. (2004). Factors on the ROP and Countermeasures for Deep Wells in the Northeastern Sichuan. Petroleum Drilling Techniques, (05), 20-21.

Guo, H. Z., Luo, L. H., & Tian, H. (2008). Cognition and practice of improving drilling speed of horizontal wells. Petroleum Technology Forum, (03), 40-43.

Li, H. Q., & Ren, Y. X. (1995). Effect of differential pressure on mechanical drilling speed. Drilling Engineering, (02), 10-15.

Liang, H. T. (2017). Research on drilling technology of horizontal well in daqing low permeability oilfield. Western Exploration Project, 29(05), 65-66, 69.

Liu, Y. (2007). Discussion on speeding up drilling in Tahe Oilfield. Western Exploration Project, (08), 57-58.

Ren, H. X., & Zhou, F. X. (2008). Increase the rate of penetration in extremely hard formations. Foreign Oilfield Engineering, (01), 28-29.

Wang, F. B. (2006). Application of high quality fast drilling technology in well deviation control. Journal of Shengli Oilfield St Aff University, (02), 50-51.

Wu, Y. X., Zhong, S. Q., & Xu, Y. G., & Gan, S. P. (2008). Present condition of horizontal well technique strength and its development trend in China. Oil Field Equipment, 37(3), 33-36.




DOI: http://dx.doi.org/10.3968/10541

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Yinlu Jia

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.


Share us to:   


Reminder

 We are currently accepting submissions via email only.

The registration and online submission functions have been disabled.

Please send your manuscripts to aped@cscanada.net,or  aped@cscanada.org  for consideration. We look forward to receiving your work.

 

We only use three mailboxes as follows to deal with issues about paper acceptance, payment and submission of electronic versions of our journals to databases:
caooc@hotmail.com; aped@cscanada.net; aped@cscanada.org

 Articles published in Advances in Petroleum Exploration and Development are licensed under Creative Commons Attribution 4.0 (CC-BY)

ADVANCES IN PETROLEUM EXPLORATION AND DEVELOPMENT Editorial Office

Address:1055 Rue Lucien-L'Allier, Unit #772, Montreal, QC H3G 3C4, Canada.

Telephone: 1-514-558 6138
Website: Http://www.cscanada.net
Http://www.cscanada.org
E-mail:office@cscanada.net;  office@cscanada.org

Copyright © 2010 Canadian Research & Development Centre of Sciences and Cultures